[ 李繼忠 ]——(2013-3-22) / 已閱45876次
5.3.3 Consequences
Clause 5.3 Consequences of a Relief Event
5.4 Force Majeure Events
5.4.1 Scope of Force Majeure
5.4.2 Consequences of Force Majeure
5.4.3 Relief Events, Force Majeure Events and Insurance
Chapter 6 WARRANTIES
6.1 Introduction
6.2 Due Diligence
6.3 Authority Warranties
Clause 6.3 Exclusion from Warranty
6.4 Benefit of Surveys and Reports
6.5 Latent Defects Risk
Chapter 7 PRICE AND PAYMENT MECHANISM
7.1 Introduction
7.2 Features of the Payment Mechanism
7.3 Structuring the Payment Mechanism
7.4 Usage-based Systems
7.5 Calibration
7.6 Financeability
7.7 Flexibility
7.8 Other Remedies for Poor Performance
7.9 Qualitative Factors and User Satisfaction
Chapter 8 AVAILABILITY REQUIREMENTS
8.1 Introduction
8.2 Definition of Availability
8.3 Examples of Unavailability
8.4 Payment for Availability and Weighting of Critical Areas
8.5 When does Availability Commence?
8.6 When does Unavailability Commence?
8.7 Rectification of Unavailability
8.8 Service Unavailable but Used
8.9 Restoration of Availability
8.10 Planned Maintenance
Chapter 9 PERFORMANCE REQUIREMENTS
9.1 Introduction
9.2 Setting the Performance Level
9.3 Replacement of Sub-Contractors
9.4 Monitoring of Sub-Contractors
9.5 Consequences of Poor Performance
Chapter 10 PAYMENT MECHANISM MANAGEMENT AND MONITORING
總共12頁 [1] [2] [3] 4 [5] [6] [7] [8] [9] [10] [11] [12]
上一頁 下一頁