[ 劉成偉 ]——(2003-9-2) / 已閱40562次
20.2.2 Force Majeure: UPICC Art. 7.1.7
20.2.3 Excuse Due to an Impediment: PECL Art. 8:108
20.2.4 Comparison
20.3 General Rule
20.3.1 Scope of Excusable Non-performance
20.3.2 Existence of Qualifying Impediment
20.3.2.1 Introduction of a new word
20.3.2.2 Interpretation of the word
20.3.2.3 Problematic situations
20.3.3 Conditions for Exempting Impediment
20.3.3.1 Beyond control
20.3.3.2 Unforeseeable
20.3.3.3 Unavoidable or insurmountable
20.3.3.4 Causation
20.4 Responsibility for Third Parties
20.5 Temporary Impediment
20.6 Duty to Notify
20.7 Effects
20.7.1 In General
20.7.2 Effect on Right to Damages
20.7.3 Effect on Right to Performance
20.7.4 Effect on Right to Termination
Chapter 21 Hardship
21.1 Gap in the CISG?
21.2 Interplay Between CISG Excuse and UPICC/PECL Hardship
21.2.1 Hardship: UPICC Arts. 6.2.1 through 6.2.3
21.2.2 Change of Circumstances: PECL Art. 6:111
21.2.3 Gap-filling Application of Hardship Provisions?
21.3 Conditions for Invoking Hardship
21.3.1 In General
21.3.2 Crucial Point: Fundamental Alteration of Equilibrium
21.3.3 Additional Requirements for Hardship to Arise
21.3.3.1 Time factor: occurrence after conclusion
21.3.3.2 Unforeseeability
21.3.3.3 Risk not assumed
21.4 Effects of Hardship
21.4.1 In General
21.4.2 Triggering of Renegotiation
21.4.2.1 Request for renegotiation
21.4.2.2 Renegotiation in good faith
21.4.3 Court Measures in case of Hardship
21.4.4 Concluding Remarks
Chapter 22 Force Majeure & Hardship Clauses
22.1 General Considerations
22.2 Force Majeure Clause
22.2.1 Introduction
22.2.2 Drafting Considerations
22.3 Hardship Clause
總共9頁(yè) [1] [2] [3] [4] [5] [6] [7] 8 [9]
上一頁(yè) 下一頁(yè)